Contractor assessment checklist

This checklist records the checks you make before a contractor starts work for you: insurance, competence, their risk assessments and method statements, and the arrangements on your site. Complete one for each contractor and job, keep the evidence with it, and set a date to check again.

Free to use, print and copy. No sign-up. Published by Featherstone Safety Ltd. Published 26 November 2026.

Go to the template

How to use it

  1. Fill in the contractor's details and describe the job: what, where, when and how long.
  2. Ask for the documents the checklist lists before the work is agreed, not on the morning it starts.
  3. Tick Yes, No or N/A against each check and note the document seen and its expiry date.
  4. If the job is construction work, complete the CDM section as well.
  5. Record your decision: approved, approved with conditions, or not approved, and the conditions.
  6. Keep this checklist with the documents, and check again before the next job or when insurance expires.

The template

Contractor company:
Contact name and phone:
Job description and location:
Planned start and finish:
Our contact for this job:
Date assessed:
Insurance
CheckYesNoN/AComments and action needed
Employers' liability insurance certificate seen and in date. Expiry date:
Public liability insurance seen and in date. Expiry date and limit:
Professional indemnity insurance seen, if they design or advise
Competence
CheckYesNoN/AComments and action needed
Qualifications, cards or registrations the work calls for have been seen
References, or evidence of similar work done safely
A named supervisor or competent person will be on site
Workers' training records relevant to the job are available
Health and safety arrangements
CheckYesNoN/AComments and action needed
Written health and safety policy seen (where they employ five or more)
Risk assessment and method statement (RAMS) for this job received and read
COSHH information for any hazardous substances they will bring
Details of recent accidents or enforcement action asked about
Equipment they bring has current inspection or examination records
Working on our site
CheckYesNoN/AComments and action needed
Site induction booked or completed: emergency arrangements, welfare, site rules
Our own hazards they need to know about have been shared (for example asbestos, live services)
Permit to work needed (for example hot work, work at height, confined space)? Issued by:
How their work will be coordinated with ours and with other contractors
How they will report accidents, near misses and concerns to us
Construction work only (CDM 2015)
CheckYesNoN/AComments and action needed
The job is construction work, so CDM 2015 applies, including small and domestic jobs
More than one contractor: principal designer and principal contractor appointed in writing
Construction phase plan drawn up before the construction phase begins
Project notified to the HSE (F10) if it will last more than 30 working days with more than 20 workers at once, or exceed 500 person days
Decision
OutcomeConditions or reasons
Approved
Approved with conditions
Not approved
Assessed by (name and signature):
Approved by (name and signature):
Date to check again:

Free template from Featherstone Safety Ltd, featherstonesafetyhub.co.uk/templates/contractor-assessment-checklist. Adapt it to your workplace. It is not legal advice.

What the law says

A short reminder of points made in our guides. Each is labelled: the law requires names the Act or regulation, HSE guidance is advice rather than law, and good practice is neither, but is what careful organisations do.

Read the full explanation, with official sources:

This template covers Great Britain. Northern Ireland has its own legislation. It is a general template, not legal advice: adapt it to your own work and check the official guidance for anything specific.

From paper to the Hub

Keep the same record in Featherstone Safety Hub

In Featherstone Safety Hub each contractor has one record: company, scope of work, contacts, RAMS status, induction status and insurance expiry, with expiring documents flagged and an approval status you can see at a glance. High-risk contractor work can be linked to a permit to work.