
Risk Assessment Software
Risk assessment software for UK businesses
Featherstone Safety Hub is risk assessment software that helps UK businesses build, score, store and review risk assessments in one place. Guided templates and a built-in risk matrix mean a non-specialist can produce professional, defensible assessments that reflect what the HSE expects, without starting from a blank page.
Built by Thomas Featherstone TechIOSH, NEBOSH IGC and NEBOSH Environmental Management Certificate qualified, and IOSH Managing Safely trained, from £49 per month, with a 14-day free trial and no long-term contract.
Written by Thomas Featherstone TechIOSH, NEBOSH IGC and NEBOSH Environmental Management Certificate qualified, and IOSH Managing Safely trained · Reviewed June 2026
Build risk assessments without the blank page
The Management of Health and Safety at Work Regulations 1999 require every UK employer to carry out a suitable and sufficient risk assessment, and to record the significant findings if they employ five or more people. The hard part is usually knowing where to start and making sure nothing is missed.
Featherstone Safety Hub guides you through the process with structured templates, a clear risk matrix for scoring likelihood and severity, and prompts for controls and review dates. You produce a consistent, professional assessment every time, and you can export it to PDF for clients, insurers or inspectors.
- Guided templates: start from a structured template rather than a blank document.
- Risk matrix scoring: score likelihood and severity and calculate residual risk.
- Hierarchy of control: prompts to apply controls in the right order, from elimination to PPE.
- Review reminders: set review dates so assessments never quietly go out of date.
- PDF export: produce clean, branded documents for clients and audits.
COSHH assessments included
Hazardous substances need their own assessment under the Control of Substances Hazardous to Health Regulations 2002. Featherstone Safety Hub includes a COSHH assessment builder with a substance register and control records, so chemical risks are managed in the same system as everything else.
Start from an AI draft if you want one
With Featherstone AI switched on, you can describe a task in a sentence and get a draft risk assessment in the same form: hazards, who could be harmed, recommended controls following the hierarchy of control, and initial and residual scores recalculated with the Hub's own 5×5 matrix. Where you already have assessments for similar work, the draft reuses wording from up to two of them.
The draft opens as a Draft and nothing is saved until you check it, edit it and press Save. Controls are written as recommendations to confirm, never as things already in place. AI is optional, off until an admin switches it on, and included on every plan with a monthly usage allowance.
Everything joined up
Risk assessments do not exist in isolation. They link to the training your people need, the evidence you hold, and the incidents you record. Because Featherstone Safety Hub brings all of this into one platform, your assessments stay connected to the rest of your compliance rather than sitting in a separate folder.
Transparent pricing, no lock-in
Pricing is published openly at £49 per month for Essentials, £99 for Professional and £179 for Complete, billed monthly with no long-term contract. You can trial the software free for 14 days and be building assessments the same day.
Which plan includes it
Risk assessments and COSHH is included in Essentials (£49/mo), Professional (£99/mo), Complete (£179/mo) and Construction (£249/mo). Billed monthly with no long-term contract, and every plan starts with a 14-day free trial, no card required.
See it in the app
Inside Featherstone Safety Hub
Real screens from the live app, not mock-ups.


Free, no sign-up
Not sure where your business stands?
Take the free health and safety compliance check. Answer nine quick questions and get an instant, personalised report of indicative compliance gaps based on your answers, the regulations behind them and how to address them. Not legal advice. No email required.
Explore Featherstone Safety Hub
Related solutions
Related guides
Free health and safety guides
- A UK company
- Featherstone Safety Ltd, registered in England and Wales, company number 17410006.
- Built by a safety practitioner
- Thomas Featherstone TechIOSH, NEBOSH IGC and NEBOSH Environmental Management Certificate qualified, and IOSH Managing Safely trained.
- Data protection
- ICO registration 00013953517. Data hosted in Ireland (EEA), exportable at any time. See security and data protection and the privacy policy.
- Real support
- Email thomas@featherstonesafetyhub.co.uk or call 01865 570810.
Frequently asked questions
Common questions
Risk assessment software helps you create, score, store and review workplace risk assessments digitally, replacing paper and spreadsheets. Featherstone Safety Hub adds guided templates, a risk matrix and review reminders so assessments are consistent and never go out of date.
Yes. The Management of Health and Safety at Work Regulations 1999 require every employer to carry out a suitable and sufficient risk assessment, and to record the significant findings if they employ five or more people.
Yes. Each assessment walks through the hazards, who might be harmed and how, the controls and their scoring, the recorded findings and a review date, which is the structure HSE guidance sets out. If you want the method explained first, our free guide to doing a risk assessment covers the five steps with a worked example.
Yes. A built-in 5×5 matrix scores likelihood against severity and calculates the risk rating for you, before and after controls, so every assessment is scored the same way.
Yes. A COSHH assessment builder with a substance register and control records is included, so hazardous substances are managed in the same system.
Yes. It was built by Thomas Featherstone TechIOSH (NEBOSH IGC, NEBOSH Environmental Management Certificate, IOSH Managing Safely) so the professional structure is built into the templates and prompts, allowing owners and managers to produce robust assessments themselves.
Pricing is published: £49 per month for Essentials, £99 for Professional and £179 for Complete, with a 14-day free trial and no long-term contract.
Yes. You can export professional, branded PDF documents for clients, insurers and inspectors.
Build better risk assessments, faster
Start a free 14-day trial and produce professional risk assessments and COSHH documents in minutes. No setup fee, cancel any time.