
RAMS Builder
RAMS builder software for UK contractors
The Featherstone Safety Hub RAMS Builder produces risk assessment and method statement (RAMS) packs from records you already keep: your company procedures, PPE, equipment register, people and their training, and your existing risk and COSHH assessments. Six guided steps take you from the job details to an issued, company-branded PDF, with every revision kept.
Built by Thomas Featherstone TechIOSH, NEBOSH IGC and NEBOSH Environmental Management Certificate qualified, and IOSH Managing Safely trained. The RAMS Builder is part of the Construction plan at £249 per month, with a 14-day free trial and no long-term contract.
Written by Thomas Featherstone TechIOSH, NEBOSH IGC and NEBOSH Environmental Management Certificate qualified, and IOSH Managing Safely trained · Reviewed June 2026
Why RAMS take so long, and go wrong
Principal contractors and clients routinely ask for RAMS before work starts. Most firms keep a Word template, copy last month's document and edit it, which is slow and is exactly how a procedure, a piece of equipment or an operative's expired training ends up in a pack it no longer belongs in.
The RAMS Builder starts from structured, reusable content instead, and checks the pack against your own records before it is issued.
How the RAMS Builder works
Six steps, with autosave and direct navigation between them: the job and site details; the work sequence built from your procedure library; the equipment to be used, from your equipment register; the people on the job and their training records; the risk and COSHH assessments that apply; and a review before issue.
- Reusable procedure library: procedures are versioned. Inserting one copies it into the RAMS, and when you edit it you choose whether to change this RAMS only or update the company procedure as well.
- Your own records, not retyped: equipment comes from the equipment register, training from your training records, and your existing risk and COSHH assessments are reproduced in full in the pack.
- Checks before issue: missing job details, an empty work sequence or a deleted assessment block issue; expiring training, stale library content or overdue inspections are flagged as warnings. These checks are not a legal compliance assessment.
- Branded PDF packs: A4 packs with your logo, contact details and accent colour, a contents page and your attachments merged in.
- Revisions and history: issued RAMS are locked. A revision is a new draft linked to the previous one, issuing it supersedes the old version, and both PDFs are kept. Every step is recorded in the audit log.
Part of a CDM project, not a document in a folder
RAMS sit inside the Construction area alongside construction phase plans, site inspections, inductions, subcontractor approval, permits and plant, so the pack for a job is connected to the project it belongs to. Training wording in the pack says what is recorded (completed, expired or incomplete), not that someone is competent or authorised.
Who it suits
Building and civils contractors, M&E and electrical firms, groundworkers, roofers, fit-out and maintenance contractors: any business that issues RAMS regularly and wants them consistent, current and quick to produce. Subcontractors can also be managed and approved from the same Construction area.
Which plan includes it
CDM project management and the RAMS Builder is in the Construction (£249/mo) plan. Billed monthly with no long-term contract, and every plan starts with a 14-day free trial, no card required.
Free, no sign-up
Not sure where your business stands?
Take the free health and safety compliance check. Answer nine quick questions and get an instant, personalised report of indicative compliance gaps based on your answers, the regulations behind them and how to address them. Not legal advice. No email required.
Explore Featherstone Safety Hub
Related solutions
- A UK company
- Featherstone Safety Ltd, registered in England and Wales, company number 17410006.
- Built by a safety practitioner
- Thomas Featherstone TechIOSH, NEBOSH IGC and NEBOSH Environmental Management Certificate qualified, and IOSH Managing Safely trained.
- Data protection
- ICO registration 00013953517. Data hosted in Ireland (EEA), exportable at any time. See security and data protection and the privacy policy.
- Real support
- Email thomas@featherstonesafetyhub.co.uk or call 01865 570810.
Frequently asked questions
Common questions
A RAMS builder produces risk assessment and method statement packs from structured content rather than a blank document. Featherstone Safety Hub's builds each pack from your procedure library, equipment register, people and training records and your existing assessments, then issues a branded PDF.
A risk assessment identifies hazards and the controls that reduce the risk. A method statement sets out the safe, step-by-step way the work will be carried out. Together they are known as RAMS and are often requested before work starts.
The Construction plan, at £249 per month or £2,490 a year. It also includes CDM project management, construction phase plans, inspections, inductions and subcontractor approval, plus everything in Professional and the awareness-training library. Every plan starts with a 14-day free trial, no card required.
Yes. Issued RAMS are locked; a revision is a new draft linked to the previous one. Issuing it supersedes the old version, and both issued PDFs are kept.
It shows the training recorded for each person on the job and flags expired, expiring or incomplete records as warnings before issue. It reports what is recorded; it does not certify that anyone is competent.
Yes. Procedures can be added to the library, including by CSV import, and then reused across RAMS.
Issue your next RAMS from the builder
Start a 14-day free trial of the Construction plan and build a RAMS pack from your own procedures, equipment and training records. No card required, cancel any time.